翻訳と辞書
Words near each other
・ Memorial to the Murdered Members of the Reichstag
・ Memorial to the People Killed by Bolsheviks
・ Memorial to the Sinti and Roma Victims of National Socialism
・ Memorial to the Soviet Internationalist Soldier
・ Memorial to the throne
・ Memorial to the Victims of Communism
・ Memorial to the Victims of Communism (Ottawa)
・ Memorial to the Victims of the Deportation of 1944
・ Memorial to Victims of Stalinist Repression
・ Memorial to Victims of the Injustice of the Holocaust
・ Memorial to Women of the Confederacy
・ Memorial to Zhou Enlai and Deng Yingchao
・ Memorial Tournament
・ Memorial Tower
・ Memorial Town Hall
Memorial Tunnel
・ Memorial Union
・ Memorial Union (Iowa State University)
・ Memorial Union (Oregon State University)
・ Memorial Union (University of Missouri)
・ Memorial Union (University of Oklahoma)
・ Memorial Union (Wisconsin)
・ Memorial Union Building
・ Memorial Union Building (MTU)
・ Memorial Union Building (New Hampshire)
・ Memorial Union Labor Organization
・ Memorial University (disambiguation)
・ Memorial University of Newfoundland
・ Memorial University of Newfoundland Botanical Garden
・ Memorial University of Newfoundland Faculty of Medicine


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Memorial Tunnel : ウィキペディア英語版
Memorial Tunnel
The Memorial Tunnel is a two-lane vehicular tunnel that formerly carried the West Virginia Turnpike through/under Paint Creek Mountain in Standard, West Virginia in Kanawha County. Closed to interstate traffic since 1987, the tunnel serves as the Center for National Response for military first responders to train for various situations that may arise in such a location without alarming the general public.〔
The tunnel's bypass is not unlike the Pennsylvania Turnpike bypassing the Laurel Hill Tunnel in 1964, followed by the bypass of the Rays Hill and Sideling Hill Tunnels in 1968.
==History==
Construction of the Memorial Tunnel commenced in 1952 and it officially opened to traffic on November 8, 1954,〔 at a final cost of $5 million. Its construction required the movement of of earth, and it was the first tunnel in the nation to have closed-circuit television monitoring. By 1976, upgrades to the Turnpike commenced, and by 1983 all but the Memorial Tunnel had been completed.〔 The tunnel created a bottleneck – the 4-lane, divided highway turnpike had to merge into the two-lane, two-way traffic configuration of the tunnel, which also had a lower speed limit. This resulted in traffic backups during periods of increased traffic, such as holiday travel seasons. Instead of upgrading and expanding the tunnel, a extension was constructed to serve as a bypass for both the tunnel and the Bender Bridge.〔 Costing $35 million to complete, of earth were removed in addition to 300,000 tons of coal being removed from the mountain.〔 The final vehicle would pass through the tunnel on July 7, 1987, and it would subsequently close for use for pass-through vehicular traffic.〔
Between 1992 and 1995, the Department of Transportation entered a deal with the state to utilize the abandoned tunnel for smoke, fire and ventilation experiments. These experiments were carried out to design better developed ventilation systems for the tunnels being constructed as part of the Big Dig in Boston; the results of the tests were also incorporated into the design of the Channel Tunnel. These experiments also resulted in the Federal Highway Administration allowing jet fans for ventilation in tunnel construction, which was a significant change to their original ventilation designs.〔 The lasting legacy of the ''Memorial Tunnel Fire Test Program'' is in both changes in ceilings materials used in tunnel construction as well in the approved use of jet fans for ventilation during construction.〔(【引用サイトリンク】Memorial Tunnel Fire Test Program )
By 2000, the tunnel had been selected as the location where the Center for National Response would conduct anti-terrorism training exercises.〔 The current facilities offered in the center include:
* A rubble area to simulate collapsed buildings
* An emergency egress trainer〔
* A subway station, complete with of track and two subway cars from Boston's Green Line
* A drug enforcement section〔
* A highway tunnel section, complete with a New York City Transit Authority bus, firetrucks, a tractor-trailer and other vehicles〔
* A 50-car pileup wreck complete with hazardous materials
Groups from around the country are sending personnel to West Virginia to train in the facility. In all, about 160,000 first responders have been trained by West Virginians.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Memorial Tunnel」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.